Our Mission:

Enhancing our vibrant and healthy community by developing an ever-expanding network of trails.

Connect:

  • facebook
  • flickr
  • twitter

Upcoming Detour on the Rivergreenway

Posted on Friday, January 13, 2012

On February 20, 2012, the Rivergreenway behind the Water Filtration Plant along Spy Run Ave will be closed for construction until at least July 2013. A detour has been arranged using the trail/sidewalk along Spy Run Ave to Baltes Ave, following the alley to Wagner St, which will take you to Griswold Dr, where you can pick up the St. Joe Pathway. Phew! Talk about a mouthful. If you're confused by all that, refer to the map below, which shows things much more clearly. The detour is in orange.

Posted in General