Completed Phases
Current Phase
Engineering & Design
Length
.94 Miles
Project Owner
City of Fort Wayne Public Works
Project Description
10 foot wide trail alone the south side of Tillman Road from Lemar Drive/Fellowship Missionary Church to Hessen Cassel and along the north side of Tillman Road from Hessen Cassel to Chadwick Drive, connecting with Crown Colony, Trier Ridge Park, and Roosevelt Reserves.
Topographic survey and location control route survey have been completed. Design will be complete in 2026 with right of way acquisition to follow in 2027.
Last Updated
November 2026